For compute developers
Which conditions limit the proposal?
Examine additional flexible load before advancing site diligence. Keep the duration, power limits and evidence gaps beside the finding.
Headroom / Read-only capacity evidence
Check whether additional flexible load fits the supplied power, energy and fuel evidence over a defined period, while keeping existing commitments and reserves protected.
Complimentary First Site Evaluation, subject to suitable records and agreed scope.
Headroom / Combined Stage 4 finding
Synthetic example · simulated site dataThe question
One grid-connected site, one battery and one already-running diesel generator. Supplied profiles, not measured performance.
Inspect the finding and its basis →Request not supported
Next: review the supplied profile and rating with the site engineer. Fuel protection and baseline-policy failures also remain in the retained result. This is a modeled failure, not an observation of equipment performance.
One decision, shared across the parties
For compute developers
Examine additional flexible load before advancing site diligence. Keep the duration, power limits and evidence gaps beside the finding.
For site owners & operators
Make existing demand, backup needs and protected obligations visible before discussing another use of the site.
For power & infrastructure partners
Review the inputs, assumptions and supporting record without replacing the parties' operating systems or responsibilities.
From records to review
Agree the question, period, written authorization and data handling.
An analyst aligns units, time coverage and meter boundaries; gaps stay visible.
Your engineer confirms the mapped inputs, limits and assumptions.
Compare baseline and requested load against power, resources and protection rules.
Examine the result, limiting factors, evidence gaps and next steps together.
One site. One question. An agreed period.
A complimentary, scoped review, subject to suitable records. Start with a high-level question; written authorization and data handling are agreed before records are shared.
An analyst maps the exports. Your engineer confirms the boundaries, timing, limits and assumptions.
The combined analysis follows supplied grid power, battery energy and diesel fuel profiles through a finite period, accounting for existing commitments, protected obligations and reserves. Headroom reads records; it does not operate equipment or need control credentials.
Software verification uses simulated records. Real-site applicability and external engineering review remain to be established. A finding is not a capacity certification, future-availability promise or revenue guarantee.
One grid-connected site, one battery and one already-running No. 2-D diesel generator with an isolated, closed-return tank. Equipment facts, profiles, limits and permissions must be evidenced.
Export, startup, islanding, refueling, multiple assets, automatic dispatch and source-specific charging attribution are outside this method. A passing finite window does not establish repeatability or firm capacity.